This session is to install the various insert plugs into the lower fuselage.
The forward section also contains the nose gear well. A bit deeper and more detailed compared to the Hase F-104.
The center section that also covers the main gear bay center brace divider. Also a lead weight is secured using cyno cement.
Once the weight has set, the insert is then installed to the fuselage. A bit of foam got stuck under the insert when cementing the weight. This will be sanded off.
-
1. Piece of foam sticking to the plastic when some of the cyano cement seeped under the insert
Next the rear panel is inserted into the rear lower section of the fuselage. The fit of the 3 inserts is not perfect, but not a real issue, some clean up with a few swipes of a sanding stick will take care of that and some filler.
Next is to assemble the vertical and flying horizontal stab.
The rudder is a separate 1 piece part and is attached to the vertical tail.
Now the signature all flying horizontal stabilator/elevator. 2 parts make up the stab.
The extension is cemented in place on the stab. The Hase stab this part was moulded in place.
Next the stab is then cemented to the vertical tail, careful that it is horizontal to the tail, not crooked.
The IP top panel is then painted Khaki Green and Nato Black,.
Then placed over the IP and installed.
Next is to assemble and install the intakes and then the wings.
More to follow...