Finally finding time to get back into this project. First with the wing flying surfaces, slats and flaps.
The inner flap will be displayed down, leaving the outer flap neutral.
The outer flap and leading edge slat are attached.
Next is to assemble the missile rails.
Hase has me assemble LH/RH rail halves and a rear clear extension.
Next the rail mounting brackets are installed under nose section.
Then the rails are attached to the brackets.
Next the hud glass is installed to the IP dash coaming.
Next the very nice windscreen is carefully attached in place over IP coaming.
Next up the rear canopy window clean up the airframe to prepare for paint,
more to follow