Next is to continue work along the RH side fuselage, assemble a bomb.
More control boxes are installed on the RH side cockpit wall.
The bomb is quite large and one is carried with in the bomb bay.
The halves are assembled one half has the tail fin moulded in, once assemble, the 2nd fin is attached.
The fin support braces are then attached, a total of 8 braces.
-
1. Braces attached into the holes on each fin.
Still on the RH side fuselage, the tail wheel assy and minor details.
First a pair of 02 bottles are painted Blue and attached to their racks on the RH side rear operator compartment.
Then a set of 3 port hole windows are installed toward the RH quarter side of the fuselage.
Next to assemble the tail wheel. Normally I would wait to install this later in the build process, but I am not to familiar with Xutong and decided to proceed and assemble and install, I am normally careful not knocking it off due to handling, and there is stilll a long ways to go.
The tail wheel compartment bulkhead. Installed to the RH side rear of the fuselage.
The wheel is Russian Hub Green, Tire is painted Testor Rubber, the strut is Lt Grey.
First the strut is attached to the actuator, then the wheel is sandwiched between the two spindles and left to set, the attachmenet point is not the greatest.
Next up is to start work on the LH side of the fuselage details,
more to follow
1 additional image. Click to enlarge.