Nearly there – will it become the 11th 109 in my collection of 109's?
With a few details and touch-ups to go, the slowak is in front of the swiss E-3a with a hair
The photoetch got going, and while I were at it, decided that today is as good a day as any to get this one ready for one more post.
One of the things I had to do was install seatbelts – now why in the name of the carpetmonster did I wait till now? I really do not know. Never to be repeated (apart from one or two that is in the pipeline) as it is absolutely a pain to get them installed – at least the lap-belts MUST be in before closing the fuselage. The shoulderbelts can wait, making it a lot easier to make the deck look nice.
Well – the details has been shared during the build, but I just wanted to bragg once more – I like the nav-lights a lot.
And one last closeup of the intake and oilcooler and such. And thus another 109 is about to roll out the HalfWorks assemblyline.
Hope you enjoyed the journey – next time this pops up may be in the headlines.
Now where did I put those gunbarrels. . . . .