Now time to move forward, this part of the process will move quite rapidly as the airframe will not take long to add the stabs, wings, lower wing details. Starting at the tail, the stabs are aligned and installed, quick and easy. Next I snap in the lower wing to the fuselage, no Tenax yet, I then attach the upper wing panels for fitment along the wing to fuselage joint. At this time I have already airbrushed MM steel to the wheel wells and interior area on the lower wing. Starting along the lower wing then up along the fuselage I apply the cement, and work my way out to the wings tips. The wings are now aligned and the clipped wing tips are installed.Next time to add the radiator, intake housing bits on the lower wing. With that the airframe is almost complete next to install the lower front nose panel with the Aboukir filter attached. That we will do next time as well as get the sanding sticks out and clean up the seams. Thanks for viewing,
Chuck
Fly Navy
Fly Navy
7 attached images. Click to enlarge.